| No |
Building |
Project Description |
Program/Dept Contact |
Project Manager |
Project Mgr Phone |
Project Status (Schedule and Potential Campus Disruptions) |
|
|
|
|
|
|
|
| 1 |
Alumnae House |
Restoration of existing rooftop chimneys, repairs to slate roof, replacement of freight elevator |
Martha Berry |
Bryan Corrigan |
7631 |
Work to begin after Reunion in coordination with Alumnae House events |
|
|
|
|
|
|
|
2
|
Alumnae House
|
Replacement of the interior freight elevator
|
Pat Lichtenberg
|
Bryan Corrigan
|
7631
|
Construction Schedule: Work to begin after Graduation in coordination with Alumnae House events
|
3
|
Alumnae House
|
Restoration and selective replacement of existing slate roof
|
Pat Lichtenberg
|
Bryan Corrigan
|
7631
|
Construction Schedule: Work to begin after Graduation in coordination with Alumnae House events
|
|
|
Josselyn, ADA accessibility & elevator
|
|
Corrigan, Bryan
|
7631
|
|
|
|
Quad Residences, fire door replacement (Strong, Raymond)
|
|
Corrigan, Bryan
|
7631
|
|
|
|
Josselyn, roof/masonry/window replacement
|
|
Corrigan, Bryan
|
7631
|
|
|
Alumnae House
|
Ongoing analysis and upgrade of egress
|
|
Corrigan, Bryan
|
7631
|
|
| 2 |
Aula |
Replace two sets of main entrance doors |
Kathy Bush /Ben Lotto |
Patrick Gilchrist |
5996 |
Minimal disruption. Will need to be scheduled when no events are planned. |
| 3 |
Chilled Water Plant Control Systems |
Improvements to automated controls for energy savings and improved delivery of chilled water. |
Betsy Eismeier |
Patrick Gilchrist |
5713 |
Building occupants to receive 3-days notice of any disruptions to building service |
|
Alumnae House
|
Alumnae House, parking/exterior lighting/sidewalks
|
|
Corrigan, Bryan
|
7631
|
|
|
Alumnae House
|
Alumnae House, restroom and pub partial renovations
|
|
Corrigan, Bryan
|
7631
|
|
| 4 |
Boathouse |
The installation of new docks |
Sharon Beverly |
Jeff Horst |
5686 |
To be coordinated with Athletics |
| 5 |
Campus Lighting |
Improvements to lighting in the North and South Parking lots and the pedestrian pathway from Raymond Avenue to the Townhouses |
Kiki Williams / Antonia Sweet |
Patrick Gilchrist |
5996 |
Disruptions will be limited. Use of the pedestrian pathway to the Townhouses to be coordinated with Summer Programs |
|
|
Presidents House, bathroom upgrades 4 total
|
Betsy Eismeier
|
Corrigan, Bryan
|
|
|
|
|
Presidents House, chimney repairs
|
Betsy Eismeier
|
Corrigan, Bryan
|
|
|
|
|
Presidents House, masonry/roofing repairs
|
Betsy Eismeier
|
Corrigan, Bryan
|
|
|
|
|
|
Betsy Eismeier
|
|
|
|
8
|
Campus Roadways
|
General repairs to be specified
|
Betsy Eismeier
|
Jeff Horst
|
5686
|
Campus Community to receive 24 hours notice of disruptions to roadways
|
1
|
|
Science, New Building
|
Betsy Eismeier
|
Jeff Horst
|
7868
|
|
|
|
Science, planning and design fees
|
Betsy Eismeier
|
Jeff Horst
|
7868
|
|
|
|
Wimpfheimer, renovation including temporary space
|
Betsy Eismeier
|
Jeff Horst
|
7868
|
Does this include sprinklers?
|
|
|
Wimpfheimer, space relocation study
|
Betsy Eismeier
|
Jeff Horst
|
7868
|
|
8
|
Aula
|
Replace structural beams and flooring
|
Betsy Eismeier
|
Jeff Horst
|
7868
|
|
|
|
Swift, renovation
|
Betsy Eismeier
|
Jeff Horst
|
7868
|
|
|
|
Rockefeller Hall, masonry/roof/window replacement (3 years)
|
Betsy Eismeier
|
Jeff Horst
|
7868
|
|
|
|
|
Betsy Eismeier
|
Jeff Horst
|
|
|
|
|
|
Betsy Eismeier
|
Jeff Horst
|
|
|
|
|
Chicago Hall, roof replacement
|
Betsy Eismeier
|
Jeff Horst
|
|
|
|
|
|
Betsy Eismeier
|
Jeff Horst
|
|
|
|
|
Warehouse, CIS backup server room completion
|
Betsy Eismeier
|
Jeff Horst
|
7268
|
Close to Completion
|
| 6 |
Campus Roadways |
Repairs to Old Silvermine and Lockwood Roads |
Dana Kleinhans |
Jeff Horst |
5686 |
Building occupants to receive 3-days notice of any disruptions to access |
10
|
Campus Roadways
|
Repairs to the South Gate to the President's House
|
Betsy Eismeier
|
Jeff Horst
|
5686
|
Campus Community to receive 24 hours notice of disruptions to roadways
|
| 7 |
Central Heating Plant |
Improvements to controls; replacement of boiler stack inside plant. |
Betsy Eismeier |
Patrick Gilchrist |
5713 |
No disturbance to building occupants anticipated. |
12
|
Central Heating Plant
|
Replacement of boiler stack inside the central heating plant
|
Betsy Eismeier
|
Patrick Gilchrist
|
5713
|
No disturbance to building occupants anticipated.
|
| 8 |
Chapel |
Replacement of the tower roof |
Sam Speers |
Art Fisher |
7268 |
To be coordinated with building occupants and events |
| 9 |
CIS Building |
Roof replacement and exterior wall masonry repairs |
Bill Terry |
Art Fisher |
7268 |
To begin following Graduation |
|
|
|
|
|
|
|
|
|
Library Thompson), roof and gutter replacement
|
|
Fisher, Art
|
|
|
|
|
Powerhouse Theater, masonry repairs
|
|
Horst, Jeff
|
|
|
|
|
Ely Hall, roof/masonry/window replacement, 3 phases
|
|
Horst, Jeff
|
5686
|
|
| 10 |
College Center |
Air handlers replacement to improvement ventilation and air conditioning to the Bookstore and College Center atrium |
Michelle Ransom /Terry Quinn |
Patrick Gilchrist |
5713 |
Building occupants to be notified with 24-hours notice of any disruptions to building service |
| 11 |
Davison House |
Complete interior renovation, accessibility, systems, roof replacement, and restoration of exterior masonry. |
Residential Life - Luis Inoa |
Bryan Corrigan |
7631 |
Davison to close after graduation and re-open for fall 2009. Construction staging on Joss Beach to begin mid-May. Quad side disturbance to include trenching for new steam line. |
17
|
Electrical Upgrade
|
Electric meters, various buildings
|
Kiki Williams
|
Patrick Gilchrist
|
5713
|
Building occupants to receive 24-hours notice of any disruptions to building service
|
| 12 |
Faculty Housing |
Approximately 38 projects for various levels of renovation to faculty housing |
Alison O'Brien / Louise Crans |
Jeff Horst |
5686 |
Construction Schedule: To be scheduled with individual building occupants |
19
|
General Life Safety Equipment
|
This is a phased program that will address upgrades to existing life safety systems as well as address elevator deficiencies
|
Betsy Eismeier
|
Kiki Williams
|
5996
|
Building occupants to receive 24-hours notice of any disruptions to building service
|
|
|
North Lot, parking lot expansion
|
Betsy Eismeier
|
Horst, Jeff
|
5686
|
|
20
|
HVAC Controls
|
Bldg HVAC Control Upgrades
|
Betsy Eismeier
|
Gilchrist, Patrick
|
5713
|
Building occupants to be notified with 24-hours notice of any disruptions to building service
|
| 13 |
Kautz House |
Partial reconfiguration of the 1st Floor to create and additional office |
David Borus |
Laura O'Connell |
7507 |
First floor work to be scheduled during the summer but Kautz House to remain open. |
| 14 |
Kautz House |
Refinishing the wooden porch |
David Borus |
Kiki Williams |
5996 |
To be coordinated with building occupants and events |
| 15 |
Lathrop House |
Replacement of the water heater in the basement of Lathrop House |
Residential Life - Luis Inoa |
Kiki Williams |
5996 |
Building occupants to receive 3-days notice of any disruptions to building service |
|
|
Baldwin, parking lot relocation
|
|
Horst, Jeff
|
5686
|
|
|
|
Sidewalk and lighting improvements: Juliet Gate to North Parking Lot
|
|
Horst, Jeff
|
5686
|
|
|
|
Sidewalks and site amenities
|
|
Horst, Jeff
|
5686
|
|
|
|
Signage (exterior)
|
|
Horst, Jeff
|
5686
|
|
|
|
Roadway: Loop around Main Bldg (paving)
|
|
Horst, Jeff
|
5686
|
|
|
|
Blodgett, parking lot restoration
|
|
Horst, Jeff
|
5686
|
|
| 16 |
Library (Lockwood) |
Exterior work to replace deteriorating sealants and masonry |
Sabrina Pape |
Laura O'Connell |
7507 |
Exterior work to remediate water penetration |
|
|
Pratt House, renovation
|
|
Laura O'Connell
|
5686
|
No program or scope to date
|
|
|
Lathrop, masonry restoration & new roofing
|
|
Laura O'Connell
|
5686
|
|
|
|
Study South Parking Lot Expansion
|
|
Laura O'Connell
|
5686
|
|
|
|
|
|
Laura O'Connell
|
|
|
| 17 |
Library (Van Ingen) |
Renovation of the 4th Floor Art Library reading room including construction of a new connecting stair to the 3rd Floor stacks |
Sabrina Pape |
Laura O'Connell |
7507 |
To begin following Graduation |
|
Sanders Classroom
|
Sanders Classroom, roof replacement
|
|
Laura O'Connell
|
7507
|
|
| 18 |
Library (Van Ingen) |
Extensive exterior restoration of masonry, repairs to existing windows, replacement of the roof and structural repairs to the roof slab |
Sabrina Pape |
Laura O'Connell |
7507 |
Work will begin immediately following Reunion Weekend and continue through September 2009. Construction zone from Main Gate on both sides of Van Ingen Hall. |
|
|
Library Thompson), ADA accessible elevator, north end
|
|
O'Connell, Laura
|
7507
|
Renovations will begin immediately following Commencement on May 25th 2008. The first phase scope is to be finalized.
|
|
|
Library Thompson), compact shelving and learning centers
|
|
O'Connell, Laura
|
7507
|
Renovations will begin immediately following Commencement on May 25th 2008. The first phase scope is to be finalized.
|
|
|
Library Thompson), planning study
|
|
O'Connell, Laura
|
7507
|
Renovations will begin immediately following Commencement on May 25th 2008. The first phase scope is to be finalized.
|
|
|
Library Thompson), replace air handlers
|
|
O'Connell, Laura
|
7507
|
Renovations will begin immediately following Commencement on May 25th 2008. The first phase scope is to be finalized.
|
| 19 |
Main Building |
Replacement of the air conditioner serving the 2nd Floor (south) |
Betsy Eismeier |
Patrick Gilchrist |
5713 |
Building occupants to be notified with 24-hours notice of any disruptions to building service |
| 20 |
Main Building |
Replacement of carpet and improvement of lighting in the 1st Floor South Corridor |
Betsy Eismeier |
Kiki Williams |
5996 |
To be coordinated with Career Development, Financial Aid, and other offices |
| 21 |
Mudd Chemistry |
Replacement in kind of the existing Bohn rooftop air conditioning unit & cooling tower |
Sarjit Kaur |
Patrick Gilchrist |
5713 |
Building occupants to receive 3-days notice of any disruptions to building service |
| 22 |
Mudd Chemistry |
Installation of a new generator |
Sarjit Kaur |
Kiki Williams |
5996 |
Building occupants to receive 3-days notice of any disruptions to building service |
|
|
FLLAC clean brick façade
|
|
Kiki Williams
|
|
Building occupants to receive 3-days notice of any disruptions to building service
|
|
|
FLLAC, new flat roof on walkway, planning fees
|
|
Kiki Williams
|
|
Building occupants to receive 3-days notice of any disruptions to building service
|
|
|
Taylor, roof/masonry/gutter replacement
|
|
Kiki Williams
|
|
Building occupants to receive 3-days notice of any disruptions to building service
|
|
|
|
|
Kiki Williams
|
|
Building occupants to receive 3-days notice of any disruptions to building service
|
|
|
Life Safety, fire escape renewal plan
|
|
Kiki Williams
|
|
Building occupants to receive 3-days notice of any disruptions to building service
|
|
|
Ely Hall, exterior door replacement
|
|
Kiki Williams
|
|
Building occupants to receive 3-days notice of any disruptions to building service
|
|
|
Chicago Hall, main door replacement (4 sets)
|
|
Kiki Williams
|
|
Building occupants to receive 3-days notice of any disruptions to building service
|
|
|
Sanders Physics, roof replacement
|
|
Kiki Williams
|
|
Building occupants to receive 3-days notice of any disruptions to building service
|
|
|
New England, dormers and structural steel repairs
|
|
Kiki Williams
|
|
Building occupants to receive 3-days notice of any disruptions to building service
|
|
|
Olmsted, masonry repairs
|
|
Kiki Williams
|
|
Building occupants to receive 3-days notice of any disruptions to building service
|
|
|
Rockefeller Hall, exterior door replacement
|
|
Kiki Williams
|
|
Building occupants to receive 3-days notice of any disruptions to building service
|
|
|
Main Bldg, bathroom stacks
|
|
Kiki Williams
|
|
Building occupants to receive 3-days notice of any disruptions to building service
|
|
|
Raymond House, masonry repairs
|
|
Kiki Williams
|
|
Building occupants to receive 3-days notice of any disruptions to building service
|
|
|
Strong House, masonry repairs
|
|
Kiki Williams
|
|
Building occupants to receive 3-days notice of any disruptions to building service
|
|
|
Lathrop, renovation
|
|
Kiki Williams
|
|
Building occupants to receive 3-days notice of any disruptions to building service
|
|
|
Cushing House, roof replacement
|
|
Kiki Williams
|
|
Building occupants to receive 3-days notice of any disruptions to building service
|
|
|
Cushing House, bathroom stacks
|
|
Kiki Williams
|
|
Building occupants to receive 3-days notice of any disruptions to building service
|
|
|
Juliet, transfer to College Properties, LLC
|
|
Kiki Williams
|
|
Building occupants to receive 3-days notice of any disruptions to building service
|
|
|
Main Bldg, 2nd Floor Central electrical /renovation & architectural improvements
|
|
Kiki Williams
|
|
Building occupants to receive 3-days notice of any disruptions to building service
|
|
|
Main Bldg, 1st Floor South electrical /renovation
|
|
Kiki Williams
|
|
Building occupants to receive 3-days notice of any disruptions to building service
|
|
|
Main Bldg, 2nd fl North electrical/renovation
|
|
Kiki Williams
|
|
Building occupants to receive 3-days notice of any disruptions to building service
|
|
|
Baldwin Hall, roof repairs
|
|
Kiki Williams
|
|
Building occupants to receive 3-days notice of any disruptions to building service
|
|
|
Chapel, ADA access & bathroom renovation
|
|
Kiki Williams
|
|
Building occupants to receive 3-days notice of any disruptions to building service
|
|
|
|
|
Kiki Williams
|
|
Building occupants to receive 3-days notice of any disruptions to building service
|
|
|
Cable Plant, interior & exterior data wiring
|
|
Kiki Williams
|
|
Building occupants to receive 3-days notice of any disruptions to building service
|
|
|
|
|
Kiki Williams
|
|
Building occupants to receive 3-days notice of any disruptions to building service
|
|
|
|
|
Kiki Williams
|
|
Building occupants to receive 3-days notice of any disruptions to building service
|
?
|
|
Blodgett Hall, replace basement A/C
|
|
Kiki Williams
|
5713
|
Building occupants to receive 3-days notice of any disruptions to building service
|
| 23 |
New England |
General bathroom upgrades |
Ben Lotto |
Kiki Williams |
5996 |
Building occupants to receive 3-days notice of any disruptions to building service |
|
|
Olmsted, Air Handling Unit 1 & 2 Replacement
|
|
Gilchrist, Patrick
|
5713
|
|
|
|
Olmsted, autoclave replacements
|
|
Gilchrist, Patrick
|
5713
|
|
|
|
Powerhouse Theater, Air Handling Unit replacement, chill water upgrade
|
|
Gilchrist, Patrick
|
5713
|
|
| 24 |
New Hackensack |
Interior Renovations in preparation for the temporary move of Wimpfheimer Nursery School to New Hackensack during the summer of 2009 and, fro the relocation of the Thompson slide library and Art Department Faculty in connection with the Van Ingen renovations. |
Julie Riess/ Harry Roseman |
Laura O'Connell |
7507 |
To be coordinated with relocations associated with Van Ingen porjects during the summer of 2008 |
| 25 |
North Edge of Campus/Raymond Avenue Liaison |
Coordination of work with DOT and Central Hudson, landscaping, pathways, lighting |
Betsy Eismeier |
Jeff Horst |
5686 |
Work continuing through November of 2008 |
| 26 |
Maria Mitchell Observatory |
Interior renovations, window replacement and landscaping; creation of seminar room in dome, new offices for Education and College historian, with recognition of historic purpose of building through original equipment displays, photos, plaques. |
Chris Bjork |
Bryan Corrigan |
7631 |
Work continues this summer. Pedestrian walkway disturbances will occur as the contractor makes connections to chilled water lines due north of the Observatory east of Pratt House. New path to be created from Metcalf to the main entrance of the Observatory. |
33
|
|
Swift, electrical upgrade
|
|
Gilchrist, Patrick
|
5713
|
|
| 27 |
Prentiss Fields |
New Athletic Facilities |
Andy Jennings |
Art Fisher |
7268 |
While not a summer project work will be ongoing to complete the project throughout the summer. Disruptions to be coordinated with Summer Programs |
| 28 |
Powerhouse Theatre |
Install a new wood floor in performance area |
Chris Grabowski |
Naomi Davies |
7868 |
Scope to be determined and work scheduled in coordination with Summer Programs |
| 29 |
Rockefeller Hall |
Classroom Committee Renovations to Rockefeller Hall classrooms including technology upgrades. |
Ben Lotto |
Laura O'Connell |
7507 |
Renovations will begin immediately following commencement on May 25th 2008. The first phase scope is to be finalized. |
| 30 |
Rockefeller Hall |
Upgrades the ground floor Men's Bathroom |
Ben Lotto |
Patrick Gilchrist |
5713 |
This bathroom will be off line during the summer. Building occupants will be directed to other facilities within the building. |
| 31 |
Sanders Classroom |
Phase I of two-year upgrade of Butler Auditorium. 2008 work to include remediation of heating and cooling systems. |
Ben Lotto |
Laura O'Connell |
7507 |
Renovations to begin after Reunion Weekend |
37
|
|
Chill water line replacement, Van Ingen to Thompson
|
|
Gilchrist, Patrick
|
5713
|
|
| 32 |
Sewer Lines |
New sanitary lines between FLLAC and the President's House; additional work behind Pratt House. |
Betsy Eismeier |
Williams, Kiki |
5996 |
Building occupants to receive 24-hours notice of any disruptions to building service |
38
|
|
Boiler Plant, new vfd's
|
|
Gilchrist, Patrick
|
5713
|
|
| 33 |
Skinner Hall |
Repairs to the east external stair, restoration of north elevation buttress, and repairs to roof and drains |
Karen Murley |
Jeff Horst |
5686 |
Skinner Hall will be closed during the Summer 2008 to accommodate restoration work. Access will be limited to Music Department faculty and staff. |
40
|
Skinner Hall
|
Restoration of the north elevation buttress
|
Karen Murley
|
Jeff Horst
|
5686
|
Skinner Hall will be closed during the Summer 2008 to accommodate restoration work. Access will be limited to Music Department's administrative staff.
|
|
Skinner Hall
|
General repairs to the roof and drains
|
Karen Murley
|
Jeff Horst
|
5686
|
Skinner Hall will be closed during the Summer 2008 to accommodate restoration work. Access will be limited to Music Department's administrative staff.
|
|
|
Boiler Plant, oil tank maintenance
|
|
Jeff Horst
|
5713
|
|
|
|
Boiler Plant, replace water storage tanks for heating plant
|
|
Jeff Horst
|
5713
|
|
|
|
Residence Halls, install new lock cores in student room doors
|
|
Jeff Horst
|
5713
|
|
41
|
|
College Center, air handlers phase 1
|
|
Jeff Horst
|
5713
|
|
| 34 |
Smokestack |
Repair and reconstruction of the smokestack |
Betsy Eismeier |
Jeff Horst |
5686 |
No disruption to campus occupants anticipated |
| 35 |
Steam Line From Rocky to Josselyn |
Replacement of steam line |
Luis Inoa |
Bryan Corrigan |
5996 |
Trenching to begin immediately following graduation |
|
|
Old Laundry Bldg, Air Handling Unit & Condensing Unit, 2nd fl
|
|
Gilchrist, Patrick
|
5713
|
|
43
|
|
|
|
|
|
|
| 36 |
Steam line near Wimpfheimer & Blodgett |
Replacement of steam line |
Betsy Eismeier |
Kiki Williams |
5996 |
Trenching between Wimpheimer and Blodgett to begin following Graduation. Campus occupants will receive 24 notification of any disruptions to parking |
| 37 |
Storm Water Drainage |
New storm water drainage system to eliminate water pooling and building damage at the Students' Building, Noyes, Jewett, and Davison. |
Betsy Eismeier |
Kiki Williams |
5996 |
Trenching between Kenyon, Students Building and Davison to begin following Graduation. |
| 38 |
Students' Building |
Interior renovation of the ACDC food services area |
Maureen King |
Tom Allen |
7267 |
Renovations to begin immediately following Graduation, with coordination for Reunion Weekend and Summer Programs. |
| 39 |
Students' Building |
Loading dock roof replacement and masonry repairs |
Michelle Ransom |
Art Fisher |
7268 |
No disruption to campus occupants anticipated |
|
|
Sanitary Line, feasibility study
|
|
Williams, Kiki
|
5996
|
|
47
|
|
Steam Line, Strong to Lathrop
|
|
Williams, Kiki
|
5996
|
|
| 40 |
Students' Building |
Repairs to the columns at the main entrance and repairs to the wooden sofit details at the roof line |
Michelle Ransom |
Art Fisher |
7268 |
No disruption to campus occupants anticipated |
| 41 |
Tennis Courts |
Reconfiguration and resurfacing of northern-most tennis courts |
Sharon Beverly |
Jeff Horst |
5686 |
To be coordinated with Athletics |
|
|
Storm Drainage, Students Building to Strong
|
|
Williams, Kiki
|
5996
|
|
49
|
|
Water tank (300,000 gallon ) removal
|
|
Williams, Kiki
|
5996
|
|
| 42 |
Town House Road and Site Improvements |
Widening and improvement of TH roadway, upgrades of sidewalks and lighting. |
Luis Inoa |
Art Fisher |
7268 |
Anticipated to begin in May 2008. Construction permits pending |
|
|
B & G, emergency generator
|
|
Williams, Kiki
|
5996
|
|
|
|
Barn, roof replacement
|
|
Williams, Kiki
|
5996
|
|
|
|
Boiler Plant, replace main controls
|
|
Williams, Kiki
|
5996
|
|
|
|
Terrace Apts, replace primary electrical line
|
|
Williams, Kiki
|
5996
|
|
50
|
|
Walker, emergency generator
|
|
Williams, Kiki
|
5996
|
|
| 43 |
New Town House Apartments |
Construction of three new buildings in apartments (50 students). Scope includes installation of geothermal heating and cooling, all accessible buildings. |
Luis Inoa |
Art Fisher |
7268 |
Offline immediately following Graduation until early arrivals in August 2008. |
| 44 |
Various Buildings |
Installation of emergency siren |
Betsy Eismeier/ Sabrina Pape /Sharon Beverly |
Jeff Horst |
7268 |
Installation of emergency siren system on various buildings on campus |
| 45 |
Walker Field House |
Replacement of air handler for improvements to ventilation systems serving the pool |
Sharon Beverly |
Patrick Gilchrist |
5713 |
Building occupants to receive 3-days notice of any disruptions to building service |
|
|
Noyes, elevator replacement
|
|
Williams, Kiki
|
5996
|
Building occupants to receive 3-days notice of any disruptions to building service
|
|
|
Terrace Apts, replace transformers
|
|
Williams, Kiki
|
5996
|
Building occupants to receive 3-days notice of any disruptions to building service
|
|
|
College Center, solar panels
|
|
Williams, Kiki
|
5996
|
Building occupants to receive 3-days notice of any disruptions to building service
|
|
|
Students Bldg, freight elevator repairs
|
|
Williams, Kiki
|
5996
|
Building occupants to receive 3-days notice of any disruptions to building service
|
52
|
|
Students Bldg, replace transformers 208 VAC & 480 VAC
|
|
Williams, Kiki
|
5996
|
Building occupants to receive 3-days notice of any disruptions to building service
|
| 46 |
Walker Field House |
Bathroom upgrades |
Sharon Beverly |
Kiki Williams |
5996 |
Building occupants to receive 3-days notice of any disruptions to building service |
|
|
Boiler Plant, spill containment measures
|
|
Kelly, Jim
|
|
Building occupants to receive 3-days notice of any disruptions to building service
|
53
|
|
Walker, parking lot & basketball
|
|
TBD
|
|
Building occupants to receive 3-days notice of any disruptions to building service
|
| 47 |
Water Lines |
New water lines from Kenyon to Jewett |
Betsy Eismeier |
Kiki Williams |
5996 |
Building occupants to receive 3-days notice of any disruptions to building service |